Planned Maintenance

Our hosted VoIP network’s inbound calling paths are being upgraded to FCC required Shaken/STIR compliance. on April 24 2023 at midnight. Outbound will not be affected. The maintenance window is 1 hr.

Our hosted VoIP network’s inbound calling paths are being upgraded to FCC required Shaken/STIR compliance. on April 24 2023 at midnight. Outbound will not be affected. The maintenance window is 1 hr.